Water Distribution

Convey water to customers in a reliable cost-effective manner and provide drinking water that meets all State and Federal regulations.

PROGRAM ACTIVITIES

Operate and maintain the City’s potable water distribution system comprised of distribution pipelines, pump stations, reservoirs, pressure reducing stations and metered service connections.


Meet 100% of all applicable State and Federal requirements.


Operate and maintain the groundwater well system.


Implement and oversee the cross connection control program.


Serve as primary dispatch for all Water and Wastewater emergencies and secondary back-up for all Streets emergencies.

PROJECT OBJECTIVES FOR FISCAL YEAR 2023

Assist with Transmission Main Renewal Project.


Assist with Desal Conveyance Main Project.


Provide water main design and construction support for City utility coordination projects.


Assist with constructing FY23 A and B water main replacement projects.


Assist with designing FY24 A and B water main replacement projects.


Develop Global Positioning System (GPS) data collection program.


Completion of Vista Del Monte service relocations and City easement pipeline abandonment.


Initiate assessment of Programmable Logic Controllers (PLC) for replacement planning.


Develop an air valve and blow off maintenance program.


Assist with designing of water main relocation at Los Patos / Highway 101 crossing.