Preview link expired

Click Preview button on the Setup Online Publication page to generate a new Preview link

Table of Contents

Measure C - Annual Accountability Report 2025

Santa Barbara Measure C
INTRODUCTION TO MEASURE C
Introduction to Measure C
COUNCIL ESTABLISHED PRIORITIES FOR MEASURE C FUNDING
COUNCIL ESTABLISHED PRIORITIES FOR MEASURE C FUNDING
SCHEDULE OF SOURCES AND USES MEASURE C
FY2025 SCHEDULE OF SOURCES AND USES - MEASURE C FY2026 SCHEDULE OF SOURCES AND USES
FY2025 PROJECT INFORMATION SHEETS
City Administration
Homeless Response Parking Garages: Floor, Deck and Roof Paseo Nuevo Development Eval Revenue Control System State Street Action Plan State Street Master Plan
Fire
Emergency Response Equipment Replacement Fire Regional Dispatch Center
Information Technology
Fire Station 1 EOC Radio System Upgrade Project
Library
Central Library Faulkner Gallery AV Equipment Upgrade Central Library Faulkner Gallery Interior Renovation Central Library Historic Doors and Tympanum Central Library Lobby Update Central Library Roof Terrace Renovation Central Library Americans with Disabilities Act (ADA) Elevat Central Library Lower-Level Workspace Renovation Library Technology Replacement Central Library Upper-Level Needs Assessment
Parks & Recreation
Alameda Plaza Renovation Alice Keck Park Memorial Garden Cabrillo Pavilion Renovation - Loan Repayment CC Master Plan - Spencer Adams Chase Palm Park Renovation Dwight Murphy Field Renovation Franceschi Park Renovation Median and Parkway Landscape Renovation Moreton Bay Fig Tree Municipal Tennis Center Ortega Park Renovation Park & Recreation Equipment Replacement Park Infrastructure Safety Program Parks Restroom Buildings - Minor Renewal Playground Replacement Program Shoreline Park Safety Improvements Trails and Walkways Urban Forest Management Plan Implementation Westside Center Event Renovation Franklin Neighborhood Center Parking Lot Hale Park Reno/Open Space Management Honda Valley Open Space Management Louise Lowry Davis Renovation Park Field Renewal and Irrigation Plaza del Mar Band Shell Renovation Plaza Del Mar Lighting
Police
Police Equipment Replacement Santa Barbara Police Station Project
Public Works - Facilities
630 Garden Bldg. Office Improvements Carrillo Gym - Minor Renewal Carrillo Gymnasium Renovation Eastside Library Construction - Garage Facilities Renewal, Annual Sewer Lateral Repair Facilities Renewal, Flooring, Paint, and Finishes Facilities Renewal, HVAC Maintenance & Replacement Facilities Renewal, Miscellaneous Minor Facilities Projects Library Plaza Renovation Minor Renewal – 630 Garden Building Minor Renewal – Fire Station 6 Minor Renewal – La Mesa Park Restroom Minor Renewal - Los Baños Building Minor Renewal – Municipal Tennis Court Building Paving at City Facilities Walkways & Building Pathways Americans with Disabilities Act (ADA) Transition Plan City Hall Plumbing and Restroom Upgrades Minor Renewal – La Mesa Park Restroom Public Works Corporate Yard Master Plan PW Operations - Annual Streets Neighborhood Improvements Public Works Operations-Annual Unplanned Utility PW Operations - Building Envelope Renewal Remediation Repairs & Replacement
Public Works - Streets
ATP State St Undrcrs @ Hwy101 Business Corridor Improvements Cliff Drive: Urban Highway to Complete Street Transformation De La Guerra Plaza Revitalization De La Vina Street Bridge Replacement Project Drainage Improvements Drainage: Citywide Drainage Assessment Facilities Master Plan Drainage: Gutierrez Storm Drain Improvements Local Highway Safety Improvement Program (HSIP) De La Vina P Laguna Pump Station Las Positas Multiuse Pathway Gibraltar & Skofield Roadway Repairs Milpas Street Crosswalk Safety and Sidewalk Widening Project Pavement Improvements - Overlays Project Pedestrian Enhancement: Annual Sidewalk Infill Public Works Corporate Yard Repave Sidewalk Replacement, Repairs, and Access Ramps Sidewalk Repairs Street Lighting Improvements Traffic Management System Traffic Signal Maintenance Traffic Signal Upgrades Westmont Storm Drain Westside and Lower West Active Transportation Plan Implement
Sustainability & Resilience
Electric Vehicle Infrastructure

FY26 PROJECTS

Measure C FY2026 Project List

Something Went Wrong

Please try again. If this problem persists, contact support.

Powered by OpenGov