Town of Provincetown

FY 2024 Budget

Water Enterprise Fund


Personnel Expenditures

Operating Expenditures

Budget History

Program Description

  • The Water Department is responsible for providing its customers with safe, high quality drinking water adhering to U.S. Environmental Protection Agency (EPA) and Massachusetts Department of Environmental Protection (MassDEP) drinking water regulations.

  • The Department operates and maintains three groundwater sources located within the Town of Truro: the Knowles Crossing Wellfield consisting of three gravel packed wells; the Paul Daley Wellfield consisting of six active gravel packed wells; and North Union Field consisting of two gravel packed wells.

  • Operate and maintain two water treatment facilities: a 1.2 Million Gallon per Day (MGD) membrane filtration facility treating raw water from the Knowles Crossing and Paul Daley wellfields, and a .734 Million Gallon per Day (MGD) corrosion control facility treating the North Union Field wells.

  • Provide customer support and billings for over 4,000 accounts

  • Operate and maintain over 45 miles of water distribution piping, two water storage facilities totaling 6.4 million gallons, 11 gravel packed wells, two water treatment facilities, one booster pump station, 900 gate valves, 282 fire hydrants, water meter maintenance to over 4,000 meters, and testing of 207 registered backflow prevention devices.

Budget Statement

The overall FY24 6001 Budget has increased 2.69%; the Operating “B” budget decreased $32,484 (-1.75%), primarily attributed to capital projects funded from retained earnings being completed, while the Personnel Services “A” budget increased only 12.6% due to a recent compensation plan implementation. Revenues for FY22 are projected to increase 6.4%, however a transfer from retained earnings is necessary for FY24 in order to cover the projected budget deficit of $90,198.


Major Accomplishments for 2022

• Replaced ninety (90) filtration modules at Knowles Crossing Water Treatment Facility during peak-season operation
• Successfully completed EPA American Water Infrastructure Act reporting requirements
• Initiated water main replacement design/engineering for Shank Painter Road reconstruction project

FY 2023 Objectives

• Complete construction of Knowles Crossing Water Distribution Storage Facility (delayed in FY22 due to funding constraints/COVID19)

• Redevelop six gravel packed wells at Paul Daley/South Hollow wellfield

• Continued leak detection in an effort to reduce unaccounted-for-water in an effort to meet 10% standard

Staffing Detail

Performance/Workload Indicators

FY 2023 Additional Budget Request

Additional Amount Requested: $2,500

Budget Line: Contracted Serv-Fuel,Gas,Diesl (522100)

One Time Only or Ongoing Expense? Ongoing

Description of Additional Program, Product or Service:

LP Fuel for Water Dept buildings and pumping station

Cost/Benefit Analysis:

Inflationary increase; failure to approve may result in budget shortfall for line item.


Additional Amount Requested: $2,500

Budget Line: Supplies - Chemicals (545100)

One Time Only or Ongoing Expense? Ongoing

Description of Additional Program, Product or Service:

Costs associated with water treatment chemicals

Cost/Benefit Analysis:

Inflationary increase; failure to approve may result in budget shortfall for line item. Significant cost increases were seen in FY23 County Collaborative Bid.


Additional Amount Requested: $4,500

Budget Line: Water Ent-Water Meters (558700)

One Time Only or Ongoing Expense? Ongoing

Description of Additional Program, Product or Service:

Costs associated with water meter purchases

Cost/Benefit Analysis:

Inflationary increase; failure to approve may result in budget shortfall for line item.