TR99R Reimbursable Transportation Projects


Project Details:

Project Start Date: 1/2/2021

Ongoing Program: Y/N

Submitting Department: Public Works

Contact Person: Larry Matsumoto

Level of Need: Desirable

Estimated Project Completion Date: 12/30/2026

Department Priority: Not Applicable

Contact Phone Number: (612) 919-1148

Website: TBD


Project Location:

Address: Citywide

City Sector: Citywide

Affected Neighborhoods: Citywide

Affected Wards: All

Various locations throughout the City.


Project Description

These funds are requested to allow Public Works Traffic Operations to do "work for others" (public and private) which will be reimbursed by the requesting agency, business, or individual.

Purpose and Justification

Provide the purpose and justification for this project.

Project Cost Breakdown

Department Funding Request

Partnerships


Have Grants for this Project been secured?

No


Describe status and timing details of secured or applied for grants or other non-City funding sources:

Not Applicable


Describe any collaborative arrangements with outside project partners, including who they are and what their role is with the project:

Not Applicable


Planning


State Law Chapter 462.356 (Subd. 2) requires review of all capital improvements for compliance with the comprehensive municipal plan. Chapter 13, Section 4 of the City Charter requires Location and Design Review for the purpose of approving the sale of bonds for these projects. Transportation: Minneapolis will build, maintain and enhance access to multi-modal transportation options for residents and businesses through a balanced system of transportation modes that supports the City’s land use vision, reduces adverse transportation impacts, decreases the overall dependency on automobiles, and reflects the city’s pivotal role as the center of the regional transportation network. This project is consistent with planning and policy guidelines set forth in the City’s comprehensive plan Minneapolis 2040.


Provide the date that Location and Design Review was conducted for the project, the outcome of that analysis and the date formal action was taken by the Planning Commission:

Location and Design Review for this project took place April 17, 2009. The project was found consistent with the comprehensive plan by the City Planning Commission on April 23, 2009; no additional review is required.


Economic Development


Will the project contribute to growth in the city’s tax base?

No impact on existing tax base.


Describe the economic development impact of the project:

Not Applicable


Does the project support redevelopment opportunity that without the project would be infeasible?

Not Applicable

Transportation


Is the proposed project on an existing or planned transitway, transit route, or high-volume pedestrian corridor? If yes, provide details on how the project will improve the transit and/or pedestrian experience.

Not Applicable


Does the proposed project anticipate multi-modal enhancements (sidewalks, bicycle or transit facilities)? Provide details.

Not Applicable


Is the right-of-way constrained and do you anticipate that modes of travel will be competing for space? Provide details, is there potential for innovative design options? Provide details

Not Applicable

Operating Impacts


Operations & Capital Asset Maintenance:

Is this request for new or existing infrastructure? Not Applicable

What is the expected useful life of the project/Improvement? Not Applicable

Year that Operating Incr/(Decr) will take effect? Not Applicable

What is the estimated annual operating cost increase or (decrease) for this project? Not Applicable

Any Prior Year Remaining Bond Authorizations? Not Applicable

Prior Year Remaining Bond Authorizations: Not Applicable


Describe how operating cost increases or decreases were determined and include details such as personnel costs, materials, contracts, energy savings, etc:

Not Applicable


If new infrastructure, discuss how the department/agency will pay for the increased annual operating costs:

Not Applicable


For new infrastructure, describe the estimated timing and dollar amount of future capital investment required to realize the full expected useful life of the project:

Not Applicable

Project Coordination


Describe completion status for ongoing projects and how and when the department/agency plans to use the prior year remaining bond authorizations:

Not Applicable


If this is a new project, describe the major project phases and timing anticipated for completing the project:

Not Applicable


Scalability/Funding Allocation Flexibility – discuss any flexibility to increase or decrease funding among the years in the five-year plan and the most that could be spent in a given year:

Not Applicable

Minneapolis Goals and Strategic Direction

Minneapolis is a growing and vibrant world-class city with a flourishing economy and a pristine environment, where all people are safe, healthy and have equitable opportunities for success and happiness.Below is a description of how this project meets each of the City's Goals. Below is a description of how this project meets each of the City's Goals.


Below is a description of how this project meets each of the City's Goals.

Public Safety


Collaborative and community-inclusive strategies to ensure safety for all members of our community:

Increase accessibility of public infrastructure and public amenities. Use design principles that ensure a safe and welcoming environment when designing all projects that impact the public realm. Prioritize safety investments in line with the Complete Streets Policy. Improve safety for pedestrians, and prioritize pedestrians over other road users, especially at street intersections; focus on signals, crosswalks, lighting, signage, visibility and lowering vehicular speeds through street design and other measures.



Environmental Justice:


The City prioritizes sustainable practices and renewable resources to equitably address climate change while restoring and protecting our soil, water and air.


Reduce the energy, carbon, and health impacts of transportation through reduced single-occupancy vehicle trips and phasing out of fossil fuel vehicles.


Plan, design, build, maintain, and operate the city’s transportation system in a way that prioritizes pedestrians first, followed by bicycling and transit use, and lastly motor vehicle use. (Complete Streets Policy. Adopted May 2016.)


Improve the pedestrian environment in order to encourage walking and the use of mobility aids as a mode of transportation.


Improve and expand bicycle facilities in order to encourage bicycling as a mode of transportation.


Improve access to goods and services via walking, biking and transit.


Support development and public realm improvements near existing and planned METRO stations that result in walkable districts for living, working, shopping, and recreating.


Proactively improve the public realm to support a pedestrian friendly, high-quality and distinctive built environment.


Improve the tree canopy and urban forest.


Improve air quality by reducing emissions of pollutants that harm human health and the environment.


Built Environment & Transportation:


The City prioritizes high quality neighborhoods, streets, infrastructure and equitable access to multimodal transportation in all parts of the City through thoughtful planning and design.


The City of Minneapolis will promote design for the built environment that is dynamic and durable, reflects the diversity of Minneapolis residents, and contributes to a sense of place and community identity. The City will also proactively improve the public realm, including streets, sidewalks, parks and open spaces between buildings, to ensure that public spaces and private development are thoughtfully connected.


Achieving this goal also requires changes to the transportation system that make it easier to walk, bike or use transit to access daily needs. The City will proactively improve the pedestrian environment and continue to build and maintain a network of bikeways, while working with Metro Transit to increase the frequency, speed and reliability of the public transit system.


Additional Information

Add any additional information you feel is important for the CLIC committee, Mayor, City Council members or the general public to know about this potential project and why it should be approved: