PROJECT TITLE: Stormwater Improvements - Village Center South


DEPARTMENT: Public Works






START DATE (FY): 05/01/2023


END DATE (FY): 04/30/2024

PROJECT DESCRIPTION

This project provides for the installation of approximately 5,583 linear feet of storm sewer pipe ranging in sizes from 12" to 48" to address structural flooding, yard flooding and nuisance drainage in the residential properties in the Village Center sub-watershed. The general project area is bound by Main Street, Kingston Ave, Center Ave, Hitchcock Ave, Hawthorne Lane, Gamble Drive, Lincoln Avenue, Jonquil Avenue, Short Street and Riverview Drive. The improvements will impact over 20+ properties, and constitute a significant effort to address persistent flooding in this area.

OPERATING IMPACT

Ongoing operational maintenance will continue such as catch basin cleaning and jetting but the new infrastructure will ensure reduced major maintenance costs.

PROJECT OBJECTIVES / STATUS

Design engineering for the improvements have been completed and included a detailed hydraulic and hydrologic model that was used to determine the best stormwater infrastructure solutions, and advances improvements identified in the Village's 2020 Stormwater Master Plan.

PROJECT COSTS

PROJECT FUNDING