ANNUAL ROAD REHABILITATION PROGRAM

VILLAGE OF LISLE | FISCAL YEAR 2023/2024 BUDGET

Annual Road Rehab

SUMMARY

PROJECT TITLE: Annual Road Rehabilitation Program


DEPARTMENT: Public Works






START DATE (FY): 05/01/2023


END DATE (FY): 04/30/2028

PROJECT DESCRIPTION

The Village completes an annual rehabilitation program on a select portion of approximately 70 centerline miles of local streets. The scope of improvements include roadway grinding and resurfacing, concrete curb repair, and ancillary curb and sidewalk removal/replacements at crossings to comply with ADA requirements. Streets for rehabilitation were identified in the 2020 Pavement Management Report, and were evaluated using a variety of factors such as current condition of the road surface, time since the last resurfacing occurred, proximity to other infrastructure projects, and other factors.

OPERATING IMPACT

The rehabilitated infrastructure will ensure reduced operational maintenance costs in the future.

PROJECT OBJECTIVES / STATUS

Design engineering for the improvements, to be constructed in the summer of 2023, is completed. This project will improve various streets throughout the Village, and complete improvements identified in the the Village's 2020 Pavement Management Report.

PROJECT COSTS

PROJECT FUNDING