PUBLIC WORKS LOCKER ROOM REMODEL

VILLAGE OF LISLE | FISCAL YEAR 2023/2024 BUDGET

Public Works Locker Room Remodel

SUMMARY

PROJECT TITLE: Public Works Locker Room Remodel


DEPARTMENT: Public Works






START DATE (FY): 05/01/2023


END DATE (FY): 04/30/2024

PROJECT DESCRIPTION

The project would include the remodel of the existing locker room at the 4905 building, which is heavily used by public works employees. The Public Works Department conducts work out of two buildings located at 4905 and 4907 Yackley Avenue. These buildings were constructed in the 1980’s and have remained relatively unchanged since that time. The current age of the building and operational needs warrant facility improvements to provide for a safe and productive work environment that meets current regulations.

OPERATING IMPACT

Operating impacts to the budget to be determined in the future.

PROJECT OBJECTIVES / STATUS

Design engineering for the improvements to be constructed in the summer of 2023 is in progress. This project would improve the Public Works employee locker room with new fixtures, showers, and other improvements.

PROJECT COSTS

PROJECT FUNDING