Public Works – Streets Division

Project #0309

Asphalt Sealcoat HA-5

Varies

Project Information/Description

Contract to provide and install a thick, heated, asphaltic liquid over existing pavement to seal cracks, seal fines grading loss in pavement and protect base material from water intrusion. This is a periodic application that is installed to extend the pavement life between OGFC applications.

Project Details

Estimated at $5.00 per SY; Total Estimated = ~$246,000 =$283,000 w 115%

Location: Varies

Tripple Ave from Hwy 160 to Ending (~3500lf)

Richard Dr from End to End (~1200lf)

Larkspur St from End to End (~1000lf)

Twin Buttes Ave from End to End (~2500lf)

Woodrose Ln from End to End (~1200lf)

Wild Iris Ave from End to End (~600lf)

Bellflower Ct from End to End (~800lf)

Jackson Place from End to End (~500lf)

Conejo Place from End to End (~1000lf)

Hillcrest Road

Prioritization Criteria

Project by Fund

Project Timeline

Estimated Completion: December 2023

Funding Strategy