Public Works – Streets Division
Project #0309
Asphalt Sealcoat HA-5
Varies
Project Information/Description
Contract to provide and install a thick, heated, asphaltic liquid over existing pavement to seal cracks, seal fines grading loss in pavement and protect base material from water intrusion. This is a periodic application that is installed to extend the pavement life between OGFC applications.
Project Details
Estimated at $5.00 per SY; Total Estimated = ~$246,000 =$283,000 w 115%
Location: Varies
Tripple Ave from Hwy 160 to Ending (~3500lf)
Richard Dr from End to End (~1200lf)
Larkspur St from End to End (~1000lf)
Twin Buttes Ave from End to End (~2500lf)
Woodrose Ln from End to End (~1200lf)
Wild Iris Ave from End to End (~600lf)
Bellflower Ct from End to End (~800lf)
Jackson Place from End to End (~500lf)
Conejo Place from End to End (~1000lf)
Hillcrest Road
Prioritization Criteria

Project by Fund
Project Timeline
Estimated Completion: December 2023