2023-2027 Streets/Roadway Capital Improvement Plan
2023 Budget Story - Homepage Link
Streets/Roadways Capital Improvements by Year
The specific roadways that are included in each reconstruction/overlay identified here.
Streets/Roadways Capital Improvement Funding
2023 Streets/Roadway Projects
R2023-01; 2023 Street Reconstruction Project & R2023-02; 2023 Street Overlay Project
The pavement in this area has reached the end of its useful life. The project will remove/replace the asphalt. Patch repair of curb where its heaved or settled will be performed. There will be an upgrade on the lighting system to LED fixtures and metered feed point. Spot repairs of sanitary sewer and water main will be done based on televising results and break history. Signs will be replaced to improve reflectivity and compliance with the Manual of Uniform Traffic Control Devices. Overlay Helmo Avenue from Hydram to Stillwater Boulevard, and 15th Street from Helmo to the east City Limits. Upgrade the signal at 15th/Helmo for ADA compliance.
The Cardinal Meadows neighborhood was developed in 1998. The public improvements were completed by the developer and turned over to the City as public improvements and maintenance responsibilities. The roadways around the 4Front campus were constructed between 1985 to 1997. The pavement conditions are poor and maintenance costs are increasing. The roadways at 9th, Gershwin, and Glenbrook were last replaced in 1996.
9th Street & Gershwin Avenue

Hopkins Place

2024 Streets/Roadway Projects
R2024-01; 2024 Street Reconstruction Project & R2024-02; 2024 Street Overlay Project
The pavement in this area has reached the end of its useful life. The project will remove/replace the asphalt. Patch repair of curb where its heaved or settled will be performed. There will be an upgrade on the lighting system to LED fixtures and metered feed point. Spot repairs of sanitary sewer and water main will be done based on televising results and break history. Signs will be replaced to improve reflectivity and compliance with the Manual of Uniform Traffic Control Devices. The project also includes the installation of a 8' wide bituminous path and pedestrian bridge over I694 along 40th Street.
The Oaks of Deer Run neighborhood was developed in 1993. The public improvements were completed by the developer and turned over to the City as public improvements and maintenance responsibilities.
46th Street

49th Street

2025 Streets/Roadway Projects
R2025-01; 2025 Street Reconstruction Project & R2025-02; 2025 Street Overlay Project
The pavement in this area has reached the end of its useful life. The project will remove/replace the asphalt. Patch repair of curb where its heaved or settled will be performed. There will be an upgrade on the lighting system to LED fixtures and metered feed point. Spot repairs of sanitary sewer and water main will be done based on televising results and break history. Signs will be replaced to improve reflectivity and compliance with the Manual of Uniform Traffic Control Devices. The project also includes the installation of a 6' wide concrete sidewalk along Greenway Avenue from Hudson Boulevard to 7th Street.
This neighborhood is one of the oldest areas of Oakdale. The last major resurfacing of the streets was done in 1996.
Grafton Avenue

Gresham Avenue

2026 Streets/Roadway Projects
R2026-01; 2026 Street Reconstruction Project & R2026-02; 2026 Street Overlay Project
The pavement in this area has reached the end of its useful life. The project will remove/replace the asphalt. Patch repair of curb where its heaved or settled will be performed. There will be an upgrade on the lighting system to LED fixtures and metered feed point. Spot repairs of sanitary sewer and water main will be done based on televising results and break history. Signs will be replaced to improve reflectivity and compliance with the Manual of Uniform Traffic Control Devices. An overlay of Helmo Avenue from 4th to 10th Street will be done.
The Oakrun Shores neighborhood was developed between 1995 to 1999. The public improvements were completed by the developer and turned over to the City as public improvements and maintenance responsibilities. The pavement conditions are poor and maintenance costs are increasing.
9th Street

Holly Lane

2027 Streets/Roadway Projects
R2027-01; 2027 Street Reconstruction Project & R2027-02; 2027 Street Overlay Project
The pavement in this area has reached the end of its useful life. The project will remove/replace the asphalt. Patch repair of curb where its heaved or settled will be performed. There will be an upgrade on the lighting system to LED fixtures and metered feed point. Spot repairs of sanitary sewer and water main will be done based on televising results and break history. Signs will be replaced to improve reflectivity and compliance with the Manual of Uniform Traffic Control Devices.
16th Street and Hinton Trail

16th Street and Hilo Avenue