Rum River Campus Decentralization Project
Mechanical System Decentralization:
Admin:
- New boilers – 2 500,000 btu/hr. boilers
- Replacement of 25% of radiators with new hot water terminal heating devices
- Replace 2 hydronic hot water pumps
Vail:
- New boilers – 3 850,000 btu/hr. boilers
- Replace 4 hydronic hot water pumps
- New hydronic piping routed between new boilers and pump room
ACCAP Warehouse (to be repurposed into maintenance shop at some point):
- Standalone heating system and standalone domestic water service
- 2 gas fired horizontal unit heaters
Electrical Loop Modifications
Network Recabling Refresh
- Campuswide refiber to include fully redundant connections
- Campuswide run new analog and copper connections
Project Summary
1) Use Category - Facilities
2) Project Start Date - TBD
3) Project End Date - TBD
4) FTE Impact - Not Required
5) Required by Statute - No
6) Comments - None
7) Total Estimated Cost: $3,525,000