Wastewater System - WWTP: Septage Handling Facility Upgrade
2023-2028 CFP

SUMMARY
PROJECT TITLE: Septage Handling Facility Upgrade
DEPARTMENT: Wastewater
BUDGET CODE: 440-750-594.35-63-CFP-SEW-00003
JUSTIFICATION: Improves existing service
START DATE (FY): TBD
END DATE (FY): TBD
PROJECT DESCRIPTION:
Install a prepackaged septage receiving system to remove rocks and rags from septage prior to entering septage tanks.
RELATIONSHIP TO STRATEGIC PLAN:
PROJECT OBJECTIVES / STATUS:
Rags and rocks create a significant problem in the septage tanks and associated plumbing. Rags plug the piping, valves and pump. Rocks settling in the bottom of the tanks and need to be removed using the vac truck.
Cost Estimate
Funding Sources
Operating Impacts
Operating impacts to be determined in the future.