Wastewater System - System Maintenance/Inflow and Infiltration Reduction
2023-2028 CFP

SUMMARY
PROJECT TITLE: Sanitary Sewer Collection System: System Maintenance/Inflow and Infiltration Reduction
DEPARTMENT: Wastewater
BUDGET CODE: 440-750-535-83-31
JUSTIFICATION: Improves existing service
START DATE (FY): TBD
END DATE (FY): TBD
PROJECT DESCRIPTION:
These are annual projects to repair or replace deteriorating components of the sewer collection system, to reduce inflow and infiltration of surface and ground water into the sanitary sewer, and to eliminate sewer overflows. Funds may aslo be used for bond payment for larger projects.
RELATIONSHIP TO STRATEGIC PLAN:
PROJECT OBJECTIVES / STATUS:
This project objective is to repair and/or replace deteriorating components of the sewer collection system.
Cost Estimate
Funding Sources
Operating Impacts
Operating impacts to be determined in the future.