Wastewater System - System Maintenance/Inflow and Infiltration Reduction

2023-2028 CFP

Inflow and Infiltration

SUMMARY

PROJECT TITLE: Sanitary Sewer Collection System: System Maintenance/Inflow and Infiltration Reduction

DEPARTMENT: Wastewater

BUDGET CODE: 440-750-535-83-31

JUSTIFICATION: Improves existing service

START DATE (FY): TBD

END DATE (FY): TBD

PROJECT DESCRIPTION:

These are annual projects to repair or replace deteriorating components of the sewer collection system, to reduce inflow and infiltration of surface and ground water into the sanitary sewer, and to eliminate sewer overflows. Funds may aslo be used for bond payment for larger projects.

RELATIONSHIP TO STRATEGIC PLAN:


PROJECT OBJECTIVES / STATUS:

This project objective is to repair and/or replace deteriorating components of the sewer collection system.

Cost Estimate

Funding Sources

Operating Impacts

Operating impacts to be determined in the future.