Wastewater System - Re-roof the WWTP Secondary Building

2023-2028 CFP

SUMMARY

PROJECT TITLE: Wastewater System - Re-roof the WWTP Secondary Building

DEPARTMENT: Public Services

BUDGET CODE: CFP-GG-00012

JUSTIFICATION: Maintenance

START DATE (FY): TBD

END DATE (FY): TBD

PROJECT DESCRIPTION:

This is the original roof installed in 1992 and is fair to poor condition and will need replacing. It will be replaced with a 50-Mil Duro Last PVC single ply roof membrane system.

REcommendation:

Roof is in poor condition and needs replacing.

PROJECT OBJECTIVES / STATUS:


Cost Estimate

Funding Sources

Operating Impacts

Operating impacts to be determined in the future.