Wastewater System - WWTP: Solids Handling/Dewatering Facility
2023-2028 CFP

SUMMARY
PROJECT TITLE: Wastewater System - WWTP: Dewatering Facility/ Solids Handling
DEPARTMENT: Public Works
BUDGET CODE: 440-750-594.35-63-CFP-SEW-00011
JUSTIFICATION: Improves existing service
START DATE (FY): TBD
END DATE (FY): TBD
PROJECT DESCRIPTION:
Construct a new, or expand the existing, solids handling/dewatering facility at Operations to accommodate septage sludge from the WWTP
REcommendation:
Current facility is inadequate to take care of current septage and other solids dewatering requirements. A considerable amount of staff time is taken by current system as well as reintroducing difficult material to flat/slow sewer lines this causes other issues. Relocating the facility to the WWTP would likely require an indoor facility with substantial odor control due to the plant being located near the downtown area in a residential neighborhood. Further discussions and evaluation are required to determine the best location for the facility.
PROJECT OBJECTIVES / STATUS:
Moved forward from 2022 to 2023.
Cost Estimate
Funding Sources
Operating Impacts
Operating impacts to be determined in the future.