Water
Project #1140
Rivera Bridge Drainage Repair
Rivera Bridge (River Rd.)
Project Information/Description
Design & Construction of erosion control measures to stabilize the slope near the NW abutment of Rivera Bridge.
Project Goal/Benefits
The project will improve an existing poor drainage area which has shown signs of erosion and damage as a result of draining water during necessary water quality flushing operations. Overall the improvements will ensure the continued viability of the bridge and avoid future need for repair of an expanded scope
Alignment with Strategic Plan
This project is in alignment with the Strategic Plan objective of Ensuring An Effective Infrastructure Network.
Prioritization Criteria
Project Budget by Fund
Project Timeline
Estimated Completion: October 2022